| External Wall : |
Ceramic mosaic tiles to be used on the external walls
of all residential towers. Curtain walls, aluminum panels
and ceramic mosaic tiles to be used on the external walls
of the podium.
|
| Internal Wall : |
Internal walls of residential units being HardiWall
finished with emulsion paint on skim coat. The inner face
of in-situ concrete walls to be finished with emulsion paint
on cement and sand plaster, while that of precast facade
to be finished with emulsion paint on skim coat plaster.
Ceiling to be finished with emulsion paint on skim coat. |
Flooring :
|
Oak engineered timber flooring with oak wood
skirting to be installed in all residential units. |
Window :
|
Aluminum window frames in natural anodized
finish with green tinted glazing to be installed in all residential
units. |
| Bay Window : |
Granite windowsill boards to be fixed at bay
windows inside the bedroom of all residential units. |
| Door : |
Solid core timber entrance door to be finished
with wooden veneer and hard wood doorframe stained with colour.
Deluxe fingerprint door lock and viewer are to be installed
at the entrance door. Bedroom, bathroom and kitchen doors
are to be finished with wooden veneer and hard wood doorframe
stained with colour. Natural stone thresholds to be installed
at the doors of entrance, bathroom and kitchen. |
| Kitchen : |
Floor to be finished with crystallized glass
stone. Internal walls to be finished with clear mirror/tempered
glass panels with grey coating and stainless steel decorative
panels up to the line of aluminum false ceiling (area behind
the kitchen cabinets to be finished with white ceramic
tiles). Light fittings to be provided.
"LEICHT" kitchen cabinets, "STARON" counter-top
and sink with "AXOR" mixer to be installed.
Other facilities provided include "TGC" 2-burner
glass-top built-in hob, "MIELE" microwave oven and cooker
hood, "SIEMENS" built-in type fridge and freezer, "SIEMENS" built-in
type washer-dryer and "SAMSUNG" LCD TV/kitchen
TV or monitor of comparable quality and standard.
|
| Bathroom : |
Floor to be finished with crystallized glass
stone. Internal walls to be finished with natural stone
and bronze mirrors up to the line of aluminum false ceiling
(area behind the vanity cabinet to be finished with white
ceramic tiles). Vanity cabinet to be finished with marble
counter-top and mirror cabinet to be installed. High quality
sanitary wares include "DURAVIT" water closet
and "TOTO" bathtub.
"FANTINI" shower mixer with shower head, "VILLEROY & BOCH" wash
basin and "FANTINI" basin mixer or "JADO" shower
mixer with shower head, "FLAMINIA" wash basin
and "JADO" basin mixer to be installed.
Other fittings and accessories include toilet paper
holder, curtain rod and towel bar. "IMASU" exhaust
fan, wired telephone set and "SAMSUNG" LCD
TV/ bathroom TV of comparable quality and standard will
also be provided.
|
| Balcony and Utility Platform : |
Floors to be finished with natural granite
and walls to be finished with ceramic mosaic tiles. Glass
balustrade and/or metal railing to be installed and light
fittings to be provided. |
| G/F & P/F Shuttle Lift Lobby : |
G/F main shuttle lift lobby to be finished
with natural stone flooring. Internal walls to be decorated
with natural stone, patterned fibre-glass panels, mirrors
and wall lamps. False ceiling with special-designed chandelier/light
fittings and air-conditioning system to be installed.
G/F to 3/F secondary shuttle lift lobby to be finished
with natural stone flooring. Internal walls to be decorated
with natural stone. False ceiling and bulkhead with light
fittings to be installed.
The secondary shuttle lift lobby on P/F to be finished
with natural stone flooring. Internal walls to be decorated
with natural stone, patterned fibre-glass picture frames,
bronze mirrors and wall lamps. False ceiling with special-designed
chandelier/light fittings and air-conditioning system
to be installed.
|
| Residential Floor Lift Lobby : |
Each residential tower entrance lobby on
P/F to be finished with natural stone flooring. Internal
walls to be decorated by natural stone, patterned fibre-glass
panels, fibre-glass picture frames and bronze mirrors fitted
with wall lamps up to the line of false ceiling. False
ceiling with special-designed chandelier/light fittings
and air-conditioning system to be installed.
Lift lobby on each residential floor to be finished
with natural stone flooring. Internal walls to be decorated
with natural stone, wood veneer finish and black mirrors
up to the line of false ceiling and bulkhead. False ceiling
and bulkhead with light fittings to be installed.
|
| Sky Oasis : |
Floor of Sky Oasis located on R2/F of each
residential tower to be finished with gravel and homogenous
tiles. Walls to be finished with ceramic tiles and homogenous
tiles. Decorative sculptures and benches to be fixed and
installed. |
| Lift : |
Each residential tower will be served by
four high-speed "FUJITEC" lifts. The typical
lift cars in each residential tower to be decorated with
natural stone flooring. Internal walls to be finished with
natural stone, "EBONY" wood veneer wall panels
and black mirrors. Black mirror finish stainless steel
false ceiling with light fittings to be installed. Air-conditioner
and "IONFUL" air-purifier are to be provided
inside the passenger lift cars.
On the podium deck, there will be five passenger lifts,
two service lifts and one scenic lift. Besides, there
will be two lifts and two escalators reserved for the
shopping arcade.
|
| Electricity and Telephone Facility
: |
Electrical outlets and telephone points to
be provided inside living/dining room and all bedrooms. "CLIPSAL" face
plate to be installed for switches and sockets. |
| TV and Audio Facility : |
Communal TV/FM points to be provided inside
living/dining room and all bedrooms. Acoustic conduits and
outlets for connection of surround sound system/home theatre
system to be provided in all residential units. |
Video Signal Connection Port :
|
Video outlet points to be provided inside kitchen
and all bedrooms. |
| Broadband Network : |
Broadband network to be reserved for all residential
units for the connection of broadband services. |
| Home Automation System : |
Intelligent home automation system to be provided
for the remote control of lightings and air-conditioners.
Childcare video surveillance system to be installed in bedroom
for connection with the kitchen LCD TV. |
| Air-conditioner : |
All bedrooms, living/dining rooms to be provided
with "ELECTROLUX" window-type air-conditioners. |
| Town Gas : |
Town gas piping to be installed in all residential
units for residents to apply for their own services. |
| Water Heater : |
| Typical Unit |
Water Heater Type |
| All typical units |
"TGC" temperature-modulated gas water
heater/
"TGC" temperature-modulated superslim gas water heater |
Flats C & F on 5/F-22/F of Tower 6
|
"TGC" temperature-modulated superslim
gas water heater, and one
"TGC" temperature-modulated gas water heater to be installed at Utility
Platform |
Flats D & E on 5/F-27/F of Tower 6
|
Two "TGC" temperature-modulated superslim
gas water heater |
|
| Security System : |
CCTV systems connected to service counter to
be installed inside all lifts. Video door phone and wireless
panic alarm button are to be provided in all residential
units. Sliding/swing door abutting the balcony/utility platform
to be equipped with break glass detector. Visitor panel,
smart card reader and security door lock are to be provided
at the entrance lobby of each residential tower. |
| Letter Box : |
Letter-box to be provided for each residential
unit at the entrance lobby on P/F of each residential tower. |
| Remarks : |
All other items not specified or any changes
should refer to the final approval by the Government. The
developer reserves the right, based on actual circumstances
or in accordance with the Architect's direction, to substitute
the intended materials as listed on the above Fittings and
Finishes Schedule with other materials of comparable quality
and standard. |